Members – don’t forget to login for discount across the AECB shop.
Estimating costs for a retrofit is complex. Costs change over time and also vary by region and by contractor. Accurate information must be obtained through quotes, however some uncertainty can be reduced by estimating some of the costs in advance. This can lead to much better estimates over time. PHribbon helps by

Here is an example of one of the input screens. You select the type of construction at the top, then the type of cost below that applies. Further settings for each one can be changed in yellow cells in the resulting new spreadsheet tab.

Retrofit Coordinators following PAS2035 to plan their retrofit use a particular process when building their PHPP. They must start with the unimproved house, try out each new measure they might use, then remove it. Then after all those results have been obtained, groups of measures can be implemented again in potential packages.
PHribbon Improvement Option Evaluation helps by automating the entire process within PHPP. For a whole house retrofit a lot of measures are needed so this can save a lot of time. It works by:

Phone:
0845 4569773 / 01559 370908
Email: [email protected]
Address:
PO Box 32, Llandysul
SA44 5ZA
Quick Links:
Site search
Contact us